John Muir Medical Center
“E3NV designed, built and installed 4 EnviroGen Cogeneration Energy Modules at the John Muir Medical Center (JMMC) 6 years ago, reducing the costs of heating, cooling and providing electricity to run equipment. JMMC also choose an absorption chiller option for cooling. E3 continues to monitor these units with its proprietary GenView software, alerting JMMC when maintenance is needed, in an effort to ensure the units are operating at peak efficiency.” Bob Brolliar Chief Engine

Embassy Suites
“The selection of BluePoint Energy Partners [E3 NV was formerly known as BluePoint] as an energy provider to Embassy Suites allows the hotel more energy flexibility, accommodating our guests needs while maintaining efficiency in an ever increasing cost environment. The hotel industry is compelled to operate as a Green industry with additional concerns for laundry and cleaning chemicals and recycling. Many guests are aware of these efforts during their stay and I believe they

The Chaminade Hotel
“The use of BluePoint[E3 NV was formerly known as BluePoint Lean-One CHP Module not only allowed an emissions compliant replacement to the older cogen unit and saves our client over $100,000 per year, it earned the Hotel a one time saleable cash emission credit worth over $100,000. The added system benefit of a standby source of electrical power was a requirement for this site. The flexibility and support of the BluePoint team[E3 NV’s core team remains the same], ensured a s

The Cooper Union
To Whom It May Concern: This letter is intended to supply verification that E3 NV, LLC and its predecessor company, Elite Energy Engineering, designed and managed the installation, start-up and commissioning of the cogeneration plant located at The Cooper Union for the Advancement of Science and Art and E3 continues to provide remote monitoring, performance reporting and other operation functions required by the New York State Research and Development Authority. Cooper Union’
