Gallery

Critical Infrastructure Modules ™
UPS CIM Interior Boston
UPS CIM Interior Boston

This is an interior picture of UPS modules that went to both Boston and Slidell for Edge Connex data centers. These are the in-wall CRAC units and fire suppression equipment.

press to zoom
Verizon - Installation
Verizon - Installation

Installed UPS modules at a Verizon facility. These modules were some of the first we made. The original project had a timeline of 18 months, but the contractor failed to deliver after 16 months. We had to design, build and install these within 6 weeks. We succeeded and took everything we learned from this project to improve our modules, manufacturing processes and more

press to zoom
Exterior Austin CIM
Exterior Austin CIM

This is the exterior of the Austin CIM modules. Our upcoming generation of modules have completely different doors, roof panels and wall panels to reduce weight and cost without sacrificing quality. That being said, we can still manufacture any of our past modules so that you can have consistency across your facilities.

press to zoom
UPS CIM Interior Boston
UPS CIM Interior Boston

This is an interior picture of UPS modules that went to both Boston and Slidell for Edge Connex data centers. These are the in-wall CRAC units and fire suppression equipment.

press to zoom
Cogeneration
Engine Testing
Engine Testing

One of our engineers is testing a cogeneration module before it is deployed.

press to zoom
John Muir Doors Off
John Muir Doors Off

John Muir Medical Center cogen before shipping. The cogen is checked to ensure that it is ready to deploy.

press to zoom
Controls
Controls

Our modules have built in controls so that they can independently should they lose connection to your control point.

press to zoom
Engine Testing
Engine Testing

One of our engineers is testing a cogeneration module before it is deployed.

press to zoom
Unique Projects
Containerized Biodiesel Plant
Containerized Biodiesel Plant

E3 worked with Greenline to develop and build a portable biodiesel system for developing nations and remote rural areas.

press to zoom
Next Gen ORC
Next Gen ORC

Assembling and packaging for a next generation Organic Rankine Cycle generator was done by E3.

press to zoom
Stacked Generators
Stacked Generators

This stacked generator design was actually the first Critical Infrastructure Module.

press to zoom
Containerized Biodiesel Plant
Containerized Biodiesel Plant

E3 worked with Greenline to develop and build a portable biodiesel system for developing nations and remote rural areas.

press to zoom